Merdian Water Phase 1 B
Residential Building
2024-
Residential Building
Residential Building
Due to its location close to the station, the development has limited car parking provision and instead provides a significant cycle storage facility at ground floor level.
I mainly supported the project during the technical design and Gateway 2 submission, focusing on developing detailed construction information and coordinating the architectural details with the structural, façade, sustainability, acoustic, fire and MEP consultants.
A key part of my work was managing the information required for the Golden Thread. I had to ensure that the details issued for Gateway 2 accurately represented the coordinated design, while also managing information that was still being developed so that outstanding information could be incorporated through the appropriate design change process.
I regularly reviewed structural, MEP, façade, fire and specialist consultant drawings and provided specific coordination comments.
Rather than simply identifying a clash, I tried to provide a clear action and proposed solution wherever possible.
▪ DATE: 2025-
▪ TYPE: Residential building
▪ LOCATION: Meridian Water, United Kingdom
▪ UNIT: 283 units
▪ CLIENT:
Vistry
▪ CONSULTANT:
Structure & Civil: Conisbee
MEP: Silcock Dowson
Fire Consultant: Buro Happold
Sprinkler: Triangle Fire
Acoustic: Sharps Redmore
BRPD: Hunters
CDMPD: Bureau Veritas